Link copied to clipboard!
Back to Jobs
Data Center Construction Technician at NTI Connect LLC
NTI Connect LLC
Columbus, OH
Engineering
Posted 1 days ago
Job Description
Job DescriptionJob DescriptionNational Technologies (NTI-A Network Connex Company) is a premier turn-key provider of fiber optic and data center installation services. Whether it be learning the latest techniques in the field or working with vendors to maximize material performance, NTI is consistently on the leading edge of innovation in the Telecommunications field. If being a part of a tight-knit organization that gets to operate in some of the most innovative environments around the world sounds like a dream job, then you should experience the culture at NTI! While providing the typical perks a large company offers, NTI remains true to its roots and at the core of our Company is a family-oriented business that treats our team as integral members of the organization and not just a number. The open door, collaborative nature of NTI allows for professional growth and cultivates the ideas to keep our Company moving into the future of the industry! Job Summary: The primary responsibilities of the Network Technician-Data Center is to support the installation of infrastructure including but not limited to racks, cabinets, grounding, fiber guide, Unistrut, and ladder rack, structured cabling, maintain control of inside plant (ISP) activities surrounding the assigned work site(s), read and understand ISP diagrams/drawings, and taking and maintaining accurate field notes. Other duties, responsibilities and qualifications may be required and/or assigned. This position requires fieldwork which may include overtime, weekends, holidays, and off hours. Travel may be required depending on the business needs.Responsibilities:Perform data center cage and overhead ladder rack in accordance with industry standards. Read and follow design engineers’ instructions and specifications, maintain the scope of work on the project and adhere to safety procedures. Prepare engineering field notes. Interpret engineering drawings, on maps and in the field and make recommendations for changes as required. Understand and adhere to customer timelines. Budget minded behaviors to review and ensure profitability on new, ongoing and completed projects Utilize one's own network of contacts to source high quality Project Managers and Technicians Serve as a corporate liaison to champion cultural change by encouraging critical corporate initiatives, a positive work environment, the enhancement of organizational morale all with the goal to drive operational efficiency. Team player that coordinates and communicates activities with other employees, departments, and management.Qualifications & Skills: Knowledge of basic tools, construction practices and communication networks. Knowledge of basket tray and overhead conveyance.Read and understanding of blueprints and drawing.Knowledge of cable installation practices, dressing cables, lacing, etc. Knowledge of basic AC and DC power plants. Knowledge of fiber optic cable types, make-up of fiber optic cables, and manufacturer specifications to prevent damage of cables. Knowledge of various manufacturers ISP racks, cabinets, ladder rack, fiber guide and termination panels. Knowledge of cable testing procedures and test equipment. Knowledge of inside plant safety measures. Knowledge of data center security processes and adhere to the measures they put in place. Strong computer skills with Microsoft applications. Ability to pay close attention to detail and make good sound decisions based on information given. Ability to multitask and stay organized under pressure. Must hold a valid driver’s license and satisfactory driving record. Education Level: High School/GED Experience: 5+ years of relevant job experience. Field of Study: Electronics, Telecommunications, Construction or Project Management.Physical Requirements: Sit, climb, balance, stoop, kneel, crouch, and crawl; lift 75 lbs.; works in all weather conditionsPay rates and benefit levels are determined by union classifications which are set by the union.NTI provides a comprehensive benefits package including health, dental, vision, life, and disability insurance and retirement savings options. For Union employees, pay rates and benefit levels are determined by union classifications which are set by the union. Network Connex believes all persons are entitled to equal employment opportunities and does not discriminate against its employees or applicants for employment because of race, color, gender, affectional or sexual orientation, domestic partnership status, ancestry, religion, national origin, citizenship status, marital status, disability, veteran status, age or any other protected group status. Upon acceptance of an offer, all candidates will be required to pass a background check and drug screening
Resume Suggestions
Highlight relevant experience and skills that match the job requirements to demonstrate your qualifications.
Quantify your achievements with specific metrics and results whenever possible to show impact.
Emphasize your proficiency in relevant technologies and tools mentioned in the job description.
Showcase your communication and collaboration skills through examples of successful projects and teamwork.